Low-voltage electrical installations - Part 6: Verification

This part of IEC 60364 provides requirements for initial and periodic verification of an
electrical installation.
Clause 6.4 provides requirements for initial verification, by inspection and testing, of an
electrical installation to determine, as far as reasonably practicable, whether the requirements
of the other parts of IEC 60364 have been met and requirements for the reporting of the
results of the initial verification. The initial verification takes place upon the completion of a
new installation or completion of an addition or an alteration to an existing installation.
Clause 6.5 provides requirements for periodic verification of an electrical installation to
determine, as far as reasonably practicable, whether the installation and all its constituent
equipment are in a satisfactory condition for use and requirements for the reporting of the
results of the periodic verification.

Errichten von Niederspannungsanlagen - Teil 6: Prüfungen

Installations électriques à basse tension - Partie 6: Vérification

L'IEC 60364-6:2016 spécifie des exigences pour la vérification initiale et périodique d une installation électrique. Cette deuxième édition annule et remplace la première édition parue en 2006. Cette édition constitue une révision technique.

Nizkonapetostne električne inštalacije - 6. del: Preverjanje

Ta del standarda IEC 60364 podaja zahteve za prvo in periodično pregledovanje električne inštalacije.
Točka 6.4 podaja zahteve za prvo preverjanje s pregledom in preskusom električne inštalacije, da bi se na najustreznejši način ugotovilo, ali so zahteve drugih delov standarda IEC 60364 upoštevane in ali se lahko izdela ustrezno poročilo. Prvo preverjanje se izvede ob dokončanju nove inštalacije oziroma dograditvi ali spremembi obstoječe inštalacije. Točka 6.5 obravnava zahteve za periodično preverjanje električne inštalacije, da bi se na najustreznejši način ugotovilo, ali so inštalacija in njene naprave v zadovoljivem stanju za uporabo in ali se lahko izdela ustrezno poročilo.

General Information

Status
Published
Publication Date
28-Aug-2016
Current Stage
6100 - Translation of adopted SIST standards (Adopted Project)
Start Date
17-Nov-2017
Due Date
16-Nov-2018
Completion Date
06-Dec-2018

Relations

Buy Standard

Standardization document
HD 60364-6:2016 - BARVE
English language
52 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day
Standard – translation
HD 60364-6:2016 - BARVE
Slovenian language
53 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST HD 60364-6:2016
01-september-2016
1DGRPHãþD
SIST HD 60364-6:2007
1L]NRQDSHWRVWQHHOHNWULþQHLQãWDODFLMHGHO3UHYHUMDQMH
Low-voltage electrical installations - Part 6: Verification
Installations électriques à basse tension - Partie 6: Vérification
Ta slovenski standard je istoveten z: HD 60364-6:2016
ICS:
91.140.50 Sistemi za oskrbo z elektriko Electricity supply systems
SIST HD 60364-6:2016 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST HD 60364-6:2016

---------------------- Page: 2 ----------------------

SIST HD 60364-6:2016


HARMONIZATION DOCUMENT HD 60364-6

DOCUMENT D'HARMONISATION

HARMONISIERUNGSDOKUMENT
July 2016
ICS 91.140.50 Supersedes HD 60364-6:2007
English Version
Low-voltage electrical installations - Part 6: Verification
(IEC 60364-6:2016)
Installations électriques à basse tension - Partie 6: Errichten von Niederspannungsanlagen - Teil 6: Prüfungen
Vérification (IEC 60364-6:2016)
(IEC 60364-6:2016)
This Harmonization Document was approved by CENELEC on 2016-06-01. CENELEC members are bound to comply with the
CEN/CENELEC Internal Regulations which stipulate the conditions for implementation of this Harmonization Document at national level.
Up-to-date lists and bibliographical references concerning such national implementations may be obtained on application to the CEN-
CENELEC Management Centre or to any CENELEC member.
This Harmonization Document exists in three official versions (English, French, German).
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.



European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels
© 2016 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
 Ref. No. HD 60364-6:2016 E

---------------------- Page: 3 ----------------------

SIST HD 60364-6:2016
HD 60364-6:2016
European foreword
The text of document 64/2107/FDIS, future edition 2 of IEC 60364-6 prepared by IEC/TC 64 "Electrical
installations and protection against electric shock" was submitted to the IEC-CENELEC parallel vote
and approved by CENELEC as HD 60364-6:2016.
The following dates are fixed:
(dop) 2017-03-01
• latest date by which the document has to be implemented at
national level by publication of an identical national
standard or by endorsement
• latest date by which the national standards conflicting with (dow) 2019-06-01
the document have to be withdrawn

This document supersedes HD 60364-6:2007.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such
patent rights.
Endorsement notice
The text of the International Standard IEC 60364-6:2016 was approved by CENELEC as a
Harmonization Document without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards
indicated:
IEC 60238 NOTE Harmonized as EN 60238.
IEC 60364-4-43 NOTE Harmonized as EN 60364-4-43.
IEC 61557-2 NOTE Harmonized as EN 61557-2.
IEC 61557-3 NOTE Harmonized as EN 61557-3.
IEC 61557-5 NOTE Harmonized as EN 61557-5.
IEC 61557-8 NOTE Harmonized as EN 61557-8.
IEC 62020 NOTE Harmonized as EN 62020.

2

---------------------- Page: 4 ----------------------

SIST HD 60364-6:2016
HD 60364-6:2016

Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.
NOTE 1 When an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.

NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 60079-17 -  Explosive atmospheres -- Part 17: EN 60079-17 -
Electrical installations inspection and
maintenance
IEC 60364 series Low-voltage electrical installations HD 60364 series
IEC 60364-4-41 2005 Low-voltage electrical installations -- Part HD 60364-4-41 2007
(mod) 4-41: Protection for safety - Protection
against electric shock
- -  + corrigendum Jul. 2007
IEC 60364-4-42 2010 Low-voltage electrical installations - Part 4-HD 60364-4-42 2011
(mod) 42: Protection for safety - Protection
against thermal effects
+ A1 2014  + A1 2015
IEC 60364-4-44 2007 Low-voltage electrical installations -- Part HD 60364-4-442 2012
(mod) 4-44: Protection for safety - Protection
against voltage disturbances and
electromagnetic disturbances
+ A1 (mod) 2015  HD 60364-4-443 2016
IEC 60364-5-51 2005 Electrical installations of building -- Part 5-HD 60364-5-51 2009
(mod) 51: Selection and erection of electrical
equipment - Common rules
- -  + A11 2013
IEC 60364-5-52 2009 Low-voltage electrical installations -- Part HD 60364-5-52 2011
(mod) 5-52: Selection and erection of electrical
equipment - Wiring systems
IEC 60364-5-53 2001 Electrical installations of buildings -- Part 5-- -
53: Selection and erection of electrical
equipment - Isolation, switching and control
+ A1 (mod) 2002  HD 60364-5-534 2008
+ A2 (mod) 2015  HD 60364-5-534 2016
IEC 60364-5-54 -  Low-voltage electrical installations -- Part HD 60364-5-54 -
5-54: Selection and erection of electrical
equipment - Earthing arrangements and
protective conductors
IEC 61557-6 -  Electrical safety in low voltage distribution EN 61557-6 -
systems up to 1 000 V a.c. and 1 500 V
d.c. - Equipment for testing, measuring or
monitoring of protective measures -- Part
6: Effectiveness of residual current devices
(RCD) in TT, TN and IT systems
3

---------------------- Page: 5 ----------------------

SIST HD 60364-6:2016
HD 60364-6:2016
IEC 61557 series Electrical safety in low voltage distribution EN 61557 series
systems up to 1 000 V a.c. and 1 500 V
d.c. - Equipment for testing, measuring or
monitoring of protective measures

4

---------------------- Page: 6 ----------------------

SIST HD 60364-6:2016




IEC 60364-6

®


Edition 2.0 2016-04




INTERNATIONAL



STANDARD




NORME



INTERNATIONALE
colour

inside










Low voltage electrical installations –

Part 6: Verification




Installations électriques à basse tension –

Partie 6: Vérification
















INTERNATIONAL

ELECTROTECHNICAL

COMMISSION


COMMISSION

ELECTROTECHNIQUE


INTERNATIONALE




ICS 91.140.50 ISBN 978-2-8322-3347-4



Warning! Make sure that you obtained this publication from an authorized distributor.

Attention! Veuillez vous assurer que vous avez obtenu cette publication via un distributeur agréé.

® Registered trademark of the International Electrotechnical Commission
Marque déposée de la Commission Electrotechnique Internationale

---------------------- Page: 7 ----------------------

SIST HD 60364-6:2016
– 2 – IEC 60364-6:2016 © IEC 2016
CONTENTS
FOREWORD . 4
6.1 Scope . 6
6.2 Normative references . 6
6.3 Terms and definitions . 7
6.4 Initial verification . 7
6.4.1 General . 7
6.4.2 Inspection . 8
6.4.3 Testing . 9
6.4.4 Reporting for initial verification . 14
6.5 Periodic verification . 15
6.5.1 General . 15
6.5.2 Frequency of periodic verification . 16
6.5.3 Reporting for periodic verification . 16
Annex A (informative) Estimation of the resistance value likely to be obtained during
continuity testing . 18
Annex B (informative) Methods for measuring the insulation resistance/impedance of
floors and walls to earth or to the protective conductor . 19
B.1 General . 19
B.2 Test method for measuring the impedance of floors and walls with a.c.
voltage . 19
B.3 Test electrode 1 . 20
B.4 Test electrode 2 . 20
Annex C (informative) Measurement of earth electrode resistance – Methods C1, C2
and C3 . 22
C.1 Method C1 – Measurement of earth electrode resistance using an earth
electrode test instrument . 22
C.2 Method C2 – Measurement of earth electrode resistance using a fault loop
impedance test instrument . 23
C.3 Method C3 – Measurement of earth electrode resistance using current
clamps . 24
Annex D (informative) Guidance on the application of the rules of Clause 6.4 – Initial
verification . 26
Annex E (informative) Model forms for reporting . 29
Annex F (informative) Model forms for inspection of electrical installations . 36
F.1 Model schedule for items requiring inspection for initial verification of an
electrical installation. . 36
F.2 Model inspection schedule of items requiring inspection for an existing
electrical installation . 40
Annex G (informative) Model schedule of circuit details and test results . 45
Annex H (informative) List of notes concerning certain countries . 46
Bibliography . 48

Figure B.1 – Test electrode 1 . 20
Figure B.2 – Test electrode 2 . 21
Figure C.1 – Measurement of the earth electrode resistance . 23
Figure C.2 – Measurement of the earth electrode resistance using an earth fault loop
impedance test instrument . 24
Figure C.3 – Measurement of earth electrode resistance using current clamps . 25

---------------------- Page: 8 ----------------------

SIST HD 60364-6:2016
IEC 60364-6:2016 © IEC 2016 – 3 –
Table 6.1 – Minimum values of insulation resistance . 10
Table A.1 – Specific conductor resistance R for copper wiring at 30 °C dependent on
the nominal cross-sectional area S for rough calculation of conductor resistances . 18
Table E.1 – Electrical installation verification report (new or altered installation) . 29
Table E.2 – Electrical installation condition report (existing installations) . 32
Table G.1 – Model schedule of circuit details and test results . 45

---------------------- Page: 9 ----------------------

SIST HD 60364-6:2016
– 4 – IEC 60364-6:2016 © IEC 2016
INTERNATIONAL ELECTROTECHNICAL COMMISSION
_____________

LOW VOLTAGE ELECTRICAL INSTALLATIONS –

Part 6: Verification

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 60364-6 has been prepared by the IEC technical committee 64:
Electrical installations and protection against electric shock.
This second edition cancels and replaces the first edition published in 2006 and constitutes a
technical revision.
This edition includes the following significant technical changes with respect to the previous
edition:
a) Normative references updated to current publications;
b) Re-numbered to align with current IEC numbering;
c) Initial inspection requirements: 3 items added;
d) Testing sequence changed;
e) General requirements for periodic reporting – more details added;
f) New Annex A: Table A.1 – Specific resistance values for copper conductors;

---------------------- Page: 10 ----------------------

SIST HD 60364-6:2016
IEC 60364-6:2016 © IEC 2016 – 5 –
g) Annex D: Example of a diagram suitable for evaluation of voltage drop. Content removed;
h) Annex E: Recommendation for electrical equipment which is being re-used in an electrical
installation. Content removed;
i) Annex F: Content replaced with new Annex E – Model forms for reporting;
j) Annex G: Changed to Annex F – Model forms for inspection of electrical installations;
k) Annex H: Changed to Annex G – Model schedule of circuit details and test results;
l) Annex H: Listing of notes concerning some countries;
m) Bibliography – Updated:
The text of this standard is based on the following documents:
FDIS Report on voting
64/2107/FDIS 64/2114/RVD

Full information on the voting for the approval of this standard can be found in the report on
voting indicated in the above table.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.
A list of all parts in the IEC 60364 series, published under the general title Low voltage
electrical installations, can be found on the IEC website.
The reader's attention is drawn to the fact that Annex H lists all of the “in-some-country”
clauses on differing practices of a less permanent nature relating to the subject of this
standard.
The committee has decided that the contents of this publication will remain unchanged until
the stability date indicated on the IEC web site under "http://webstore.iec.ch" in the data
related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.

IMPORTANT – The 'colour inside' logo on the cover page of this publication indicates
that it contains colours which are considered to be useful for the correct
understanding of its contents. Users should therefore print this document using a
colour printer.

---------------------- Page: 11 ----------------------

SIST HD 60364-6:2016
– 6 – IEC 60364-6:2016 © IEC 2016
LOW VOLTAGE ELECTRICAL INSTALLATIONS –

Part 6: Verification



6.1 Scope
This part of IEC 60364 provides requirements for initial and periodic verification of an
electrical installation.
Clause 6.4 provides requirements for initial verification, by inspection and testing, of an
electrical installation to determine, as far as reasonably practicable, whether the requirements
of the other parts of IEC 60364 have been met and requirements for the reporting of the
results of the initial verification. The initial verification takes place upon the completion of a
new installation or completion of an addition or an alteration to an existing installation.
Clause 6.5 provides requirements for periodic verification of an electrical installation to
determine, as far as reasonably practicable, whether the installation and all its constituent
equipment are in a satisfactory condition for use and requirements for the reporting of the
results of the periodic verification.
6.2 Normative references
The following documents, in whole or in part, are normatively referenced in this document and
are indispensable for its application. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any
amendments) applies.
IEC 60079-17, Explosive atmospheres – Part 17: Electrical installations inspection and
maintenance
IEC 60364 (all parts), Low-voltage electrical installations
IEC 60364-4-41:2005, Low-voltage electrical installations – Part 4-41: Protection for safety –
Protection against electric shock
IEC 60364-4-42:2010, Low-voltage electrical installations – Part 4-42: Protection for safety –
Protection against thermal effects
IEC 60364-4-42:2010/AMD1:2014
IEC 60364-4-44:2007, Low-voltage electrical installations – Part 4-44: Protection for safety –
Protection against voltage disturbances and electromagnetic disturbances
IEC 60364-4-44:2007/AMD1:2015
IEC 60364-5-51:2005, Electrical installations of buildings – Part 5-51:– Selection and erection
of electrical equipment – Common rules
IEC 60364-5-52:2009, Low-voltage electrical installations – Part 5-52: Selection and erection
of electrical equipment – Wiring systems
IEC 60364-5-53:2001, Electrical installations of buildings – Part 5-53: Selection and erection
of electrical equipment – Isolation, switching and control
IEC 60364-5-53:2001/AMD1:2002
IEC 60364-5-53:2001/AMD2:2015

---------------------- Page: 12 ----------------------

SIST HD 60364-6:2016
IEC 60364-6:2016 © IEC 2016 – 7 –
IEC 60364-5-54, Low-voltage electrical installations – Part 5-54: Selection and erection of
electrical equipment – Earthing arrangements and protective conductors
IEC 61557 (all parts), Electrical safety in low voltage distribution systems up to 1 000 V a.c.
and 1 500 V d.c. – Equipment for testing, measuring or monitoring of protective measures
IEC 61557-6, Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500
V d.c. – Equipment for testing, measuring or monitoring of protective measures – Part 6:
Effectiveness of residual current devices (RCD) in TT, TN and IT systems
6.3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
6.3.1
verification
all measures by means of which compliance of the electrical installation with the relevant
requirements of IEC 60364 is checked
Note 1 to entry: Verification comprises inspection, testing and reporting.
6.3.2
inspection
examination of an electrical installation using all appropriate senses in order to ascertain
correct selection and proper erection of electrical equipment
6.3.3
testing
implementation of measures to assess an electrical installation by means through which its
effectiveness is proved
Note 1 to entry: Testing includes ascertaining values by means of appropriate measuring instruments, said values
not being detectable by inspection.
6.3.4
reporting
recording of the results of inspection and testing
6.3.5
maintenance
combination of all technical and administrative actions, including supervisory actions,
intended to retain an item in, or restore it to, a state in which it can perform a required
function
6.4 Initial verification
6.4.1 General
6.4.1.1 Every installation shall be verified during erection, as far as reasonably practicable,
and on completion, before being put into service.
6.4.1.2 The information required by IEC 60364-5-51:2005, 514.5 and other information
necessary for initial verification shall be made available to the person carrying out the initial
verification.
6.4.1.3 The initial verification shall include comparison of the results with relevant criteria
to confirm that the requirements of the IEC 60364 series have been met.

---------------------- Page: 13 ----------------------

SIST HD 60364-6:2016
– 8 – IEC 60364-6:2016 © IEC 2016
6.4.1.4 Precautions shall be taken to ensure that the verification shall not cause danger to
persons or livestock and shall not cause damage to property and equipment even if the circuit
is defective.
6.4.1.5 It shall be verified that an extension, addition or alteration to an existing installation
complies with the IEC 60364 series and does not impair the safety of that installation, and
that the safety of the new installation is not impaired by the existing installation.
6.4.1.6 The verification shall be made by a skilled person, competent in verification.
NOTE Requirements concerning qualifications are a matter for national consideration.
6.4.2 Inspection
6.4.2.1 Inspection shall precede testing and shall normally be done prior to energizing the
installation.
6.4.2.2 The inspection shall be made to confirm that electrical equipment which is part of
the fixed installation is:
– in compliance with the safety requirements of the relevant equipment standards;
NOTE This can be ascertained by examination of the manufacturer’s information, marking or certification.
– correctly selected and erected according to the IEC 60364 series and taking into account
the manufacturer’s instructions;
– not visibly damaged or defective so as to impair safety.
6.4.2.3 Inspection shall include at least the checking of the following, where relevant:
a) method of protection against electric shock (see IEC 60364-4-41);
b) presence of fire barriers and other precautions against propagation of fire and protection
against thermal effects (see IEC 60364-4-42 and IEC 60364-5-52:2009, Clause 527);
c) selection of conductors for current-carrying capacity (see IEC 60364-4-43 and IEC 60364-
5-52:2009, Clauses 523);
d) choice, setting, selectivity and coordination of protective and monitoring devices (see
IEC 60364-5-53:2001, Clause 536);
e) selection, location and installation of suitable overvoltage protective devices (SPD) where
specified (see IEC 60364-5-53:2001 and IEC 60364-5-53:2001/AMD2:2015, Clause 534);
f) selection, location and installation of suitable isolating and switching devices (see
IEC 60364-5-53:2001, Clause 536);
g) selection of equipment and protective measures appropriate to external influences and
mechanical stresses (see IEC 60364-4-42:2010, Clause 422, IEC 60364-5-51:2005, 512.2
and IEC 60364-5-52:2009, Clause 522);
h) identification of neutral and protective conductors (see IEC 60364-5-51:2005, 514.3);
i) presence of diagrams, warning notices or similar information (see IEC 60364-5-51:2005,
514.5);
j) identification of circuits, overcurrent protective devices, switches, terminals etc. (see
IEC 60364-5-51:2005, Clause 514);
k) adequacy of termination and connection of cables and conductors (see
IEC 60364-5-52:2009, Clause 526);
l) selection and installation of earthing arrangements, protective conductors and their
connections (see IEC 60364-5-54);
m) accessibility of equipment for convenience of operation, identification and maintenance
(see IEC 60364-5-51:2005, Clauses 513 and 514);
n) measures against electromagnetic disturbances (see IEC 60364-4-44:2007, Clause 444);

---------------------- Page: 14 ----------------------

SIST HD 60364-6:2016
IEC 60364-6:2016 © IEC 2016 – 9 –
o) exposed-conductive-parts are connected to the earthing arrangement (see
IEC 60364-4-41:2005, Clause 411);
p) selection and erection of the wiring systems (see IEC 60364-5-52:2009, Clauses 521 and
522).
Inspection shall include all particular requirements for special installations or locations.
6.4.3 Testing
6.4.3.1 General
The test methods described in 6.4.3 are given as reference methods; other methods are not
precluded, provided they give no less valid results.
Measuring instruments and monitoring equipment and methods shall be chosen in accordance
with the relevant parts of the IEC 61557 series. If other measuring equipment is used, it shall
provide no less a degree of performance and safety.
The following tests shall be carried out where relevant and should preferably be made in the
following sequence:
a) continuity of conductors (see 6.4.3.2);
b) insulation resistance (see 6.4.3.3);
c) insulation resistance testing to confirm the effectiveness of protection by SELV, PELV or
electrical separation (see 6.4.3.4);
d) insulation resistance testing to confirm the effectiveness of floor and wall
resistance/impedance (see 6.4.3.5);
e) polarity test (see 6.4.3.6);
f) testing to confirm effectiveness of automatic disconnection of supply (see 6.4.3.7);
g) testing to confirm the effectiveness of additional protection (see 6.4.3.8);
h) test of phase sequence (see 6.4.3.9);
i) functional tests (see 6.4.3
...

SIST HD 60364-6
SLOVENSKI

STANDARD
september 2016













Nizkonapetostne električne inštalacije – 6. del: Preverjanje

(IEC 60364-6:2016)


Low-voltage electrical installations – Part 6: Verification

(IEC 60364-6:2016)


Installations électriques à basse tension – Partie 6: Vérification

(IEC 60364-6:2016)


Errichten von Niederspannungsanlagen – Teil 6: Prüfungen

(IEC 60364-6:2016)



















Referenčna oznaka
ICS 91.140.50 SIST HD 60364-6:2016 (sl)

Nadaljevanje na straneh II do III in od 1 do 51

© 2018-12. Slovenski inštitt za standardizacijo. Razmnoževanje ali kopiranje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST HD 60364-6 : 2016
NACIONALNI UVOD

Standard SIST HD 60364-6 (sl), Nizkonapetostne električne inštalacije – 6. del: Preverjanje, 2016, ima
status slovenskega standarda in je istoveten evropskemu harmonizacijskemu dokumentu HD 60364-6
(en), Low-voltage electrical installations – Part 6: Verification, 2016.

NACIONALNI PREDGOVOR

Evropski harmonizacijski dokument HD 60364-6:2016 je pripravil tehnični odbor Evropskega komiteja
za standardizacijo v elektrotehniki CLC/TC 64 Električne inštalacije in zaščita pred električnim udarom.
Slovenski standard SIST HD 60364-6:2016 je prevod evropskega harmonizacijskega dokumenta HD
60364-6:2016. V primeru spora glede besedila slovenskega prevoda v tem standardu je odločilen izvirni
evropski harmonizacijski dokument v angleškem jeziku. Slovensko izdajo standarda je pripravil tehnični
odbor SIST/TC ELI Nizkonapetostne in komunikacijske električne inštalacije.

Odločitev za privzem tega standarda po metodi ponatisa je v septembru 2016 sprejel tehnični odbor
SIST/TC ELI Nizkonapetostne in komunikacijske električne inštalacije.

ZVEZE S STANDARDI

S privzemom tega evropskega harmonizacijskega dokumenta veljajo za omejeni namen referenčnih
standardov vsi standardi, navedeni v izvirniku, razen tistih, ki so že sprejeti v nacionalno standardizacijo:

SIST EN 60079-17 Eksplozivne atmosfere – 17. del: Pregledovanje in vzdrževanje
električnih inštalacij
SIST HD 60364 (skupina) Nizkonapetostne električne inštalacije
SIST HD 60364-4-41:2007 Nizkonapetostne električne inštalacije – 4-41. del: Zaščitni ukrepi –
Zaščita pred električnim udarom (IEC 60364-4-41:2005, spremenjen)
SIST HD 60364-4-42:2011 Nizkonapetostne električne inštalacije – 4-42. del: Zaščitni ukrepi –
A1:2015 Zaščita pred toplotnimi učinki (IEC 60364-4-42:2010, spremenjen)
SIST HD 60364-4-442:2012 Nizkonapetostne električne inštalacije – 4-442. del: Zaščitni ukrepi –
Zaščita nizkonapetostnih inštalacij pred trenutnimi prenapetostnimi
zaradi zemeljskega stika v visokonapetostnem sistemu in zaradi napak
v nizkonapetostnem sistemu (IEC 60364-4-44:2007 (Točka 442),
spremenjen)
SIST HD 60364-4-443:2016 Nizkonapetostne električne inštalacije – 4-44. del: Zaščitni ukrepi –
Zaščita pred napetostnimi in elektromagnetnimi motnjami – 443. točka:
Zaščita pred atmosferskimi in stikalnimi prenapetostmi
SIST HD 60364-5-51:2009 Nizkonapetostne električne inštalacije – 5-51. del: Izbira in namestitev
+ A11:2013 električne opreme – Splošna pravila (IEC 60364-5-51:2005,
spremenjen)
SIST HD 60364-5-52:2011 Nizkonapetostne električne inštalacije – 5-52. del: Izbira in namestitev
električne opreme – Inštalacijski sistemi
SIST HD 60364-5-53:2015 Nizkonapetostne električne inštalacije – 5-53. del: Izbira in namestitev
električne opreme – Stikalne in krmilne naprave
SIST HD 60364-5-54 Nizkonapetostne električne inštalacije – 5-54. del: Izbira in namestitev
električne opreme – Ozemljitve in zaščitni vodniki
SIST EN 61557-6 Električna varnost v nizkonapetostnih razdelilnih sistemih za izmenične
napetosti do 1 kV in enosmerne napetosti do 1,5 kV – Oprema za
preskušanje, merjenje ali nadzorovanje zaščitnih ukrepov – 6. del:
Naprave na preostali (residualni) tok v sistemih TT, NT in IT

II

---------------------- Page: 2 ----------------------

SIST HD 60364-6 : 2016

SIST EN 61557 (skupina) Električna varnost v nizkonapetostnih razdelilnih sistemih za izmenične
napetosti do 1 kV in enosmerne napetosti do 1,5 kV – Oprema za
preskušanje, merjenje ali nadzorovanje zaščitnih ukrepov

OSNOVA ZA IZDAJO STANDARDA

– privzem HD 60364-6:2016

PREDHODNA IZDAJA

– SIST HD 60364-6:2007, Nizkonapetostne električne inštalacije – 6. del: Preverjanje (IEC 60364-
6:2006, spremenjen)

OPOMBE

– Povsod, kjer se v besedilu standarda uporablja izraz "evropski standard", v SIST HD 60364-6:2016
to pomeni "slovenski standard".

– Nacionalni uvod in nacionalni predgovor nista sestavni del standarda.

– Ta nacionalni dokument je istoveten HD 60364-6:2016 in je objavljen z dovoljenjem

CEN-CENELEC
Upravni center
Avenue Marnix 17
B - 1000 Bruselj

This national document is identical with HD 60364-6:2016 and is published with the permission of

CEN /CENELEC
Management Centre
Avenue Marnix 17
B - 1000 Brussels


POMEMBNO: Logotip "v barvah" na platnicah te publikacije opozarja, da vsebuje barve, ki so
potrebne za pravilno razumevanje njene vsebine. Uporabniki naj zato tiskajo ta dokument z
barvnim tiskalnikom.




















III

---------------------- Page: 3 ----------------------

SIST HD 60364-6 : 2016
































(prazna stran)


IV

---------------------- Page: 4 ----------------------

HARMONIZACIJSKI DOKUMENT HD 60364-6

HARMONIZATION DOCUMENT

DOCUMENT D'HARMONISATION

HARMONISIERUNGSDOKUMENT
julij 2016


ICS 91.140.50 Nadomešča HD 60364-6:2007




Slovenska izdaja

Nizkonapetostne električne inštalacije –
6. del: Preverjanje (IEC 60364-6:2016)


Low-voltage electrical installations Installations électriques à basse Errichten von Niederspannungsanlagen
– Part 6: Verification tension – Partie 6: Vérification – Teil 6: Prüfungen
(IEC 60364-6:2016) (IEC 60364-6:2016) (IEC 60364-6:2016)




Ta harmonizacijski dokument je CENELEC sprejel 1. junija 2016. Člani CENELEC morajo izpolnjevati
notranje predpise CEN/CENELEC, s katerimi so predpisani pogoji za privzem harmonizacijskega
dokumenta na nacionalno raven.

Najnovejši seznami teh nacionalnih standardov z njihovimi bibliografskimi podatki se na zahtevo lahko
dobijo pri Upravnem centru CEN-CENELEC ali kateremkoli članu CENELEC.

Ta harmonizacijski dokument obstaja v treh izvirnih izdajah (angleški, francoski, nemški).

Člani CENELEC so nacionalne elektrotehniške komisije Avstrije, Belgije, Bolgarije, Cipra, Češke republike,
Danske, Estonije, Finske, Francije, Grčije, Hrvaške, Irske, Islandije, Italije, Latvije, Litve, Luksemburga,
Madžarske, Malte, Nemčije, Nekdanje jugoslovanske republike Makedonije, Nizozemske, Norveške,
Poljske, Portugalske, Romunije, Slovaške, Slovenije, Španije, Švedske, Švice, Turčije in Združenega
kraljestva.






















CENELEC
Evropski komite za standardizacijo v elektrotehniki
European Committee for Electrotechnical Standardisation
Europäisches Komitee für Elektrotechnische Normung
Comité Européen de Normalisation Electrotechnique
Upravni center CEN-CENELEC: Avenue Marnix 17, B - 1000 Bruselj
© 2016 CENELEC Lastnice avtorskih pravic so vse države članice CENELEC               .        Ref. št. HD 60364-6:2016 E

---------------------- Page: 5 ----------------------

SIST HD 60364-6 : 2016
Uvod

Besedilo dokumenta 64/2107/FDIS, prihodnje druge izdaje IEC 60364-6, ki ga je pripravil tehnični odbor
IEC/TC 64 Električne inštalacije in zaščita pred električnim udarom, je bilo potrjeno z vzporednim
glasovanjem v IEC in CENELEC ter ga je CENELEC sprejel kot HD 60364-6:2016.

Določena sta bila naslednja datuma:
– zadnji datum, do katerega mora biti dokument privzet na (dop) 2017-03-01
nacionalni ravni z izdajo istovetnega nacionalnega
standarda ali z razglasitvijo
– zadnji datum, do katerega je treba umakniti nacionalne (dow) 2019-06-01
standarde, ki so v nasprotju s tem dokumentom

Ta dokument nadomešča HD 60364-6:2007.

Upoštevati je treba, da so nekateri elementi tega dokumenta lahko predmet patentnih pravic. CENELEC
[in/ali CEN] ni odgovoren za identifikacijo katerekoli ali vseh teh pravic.



Razglasitvena objava

Besedilo mednarodnega standarda IEC 60364-6:2016 je CENELEC odobril kot harmonizacijski
dokument brez kakršnekoli spremembe.

V literaturi, navedeni v uradni izdaji, je treba dodati naslednje opombe k navedenim standardom:

IEC 60238 OPOMBA Harmoniziran kot EN 60238

IEC 60364-4-43 OPOMBA Harmoniziran kot EN 60364-4-43

IEC 61557-2 OPOMBA Harmoniziran kot EN 61557-2

IEC 61557-3 OPOMBA Harmoniziran kot EN 61557-3

IEC 61557-5 OPOMBA Harmoniziran kot EN 61557-5

IEC 61557-8 OPOMBA Harmoniziran kot EN 61557-8

IEC 62020 OPOMBA Harmoniziran kot EN 62020



2

---------------------- Page: 6 ----------------------

SIST HD 60364-6 : 2016

Dodatek ZA
(normativni)




Normativna sklicevanja na mednarodne publikacije z njihovimi ustreznimi
evropskimi publikacijami

Za uporabo tega dokumenta so, v celoti ali delno, nujno potrebni spodaj navedeni dokumenti. Pri
datiranih dokumentih velja samo navedena izdaja. Pri nedatiranih dokumentih velja najnovejša izdaja
dokumenta (vključno z morebitnimi spremembami).
OPOMBA: Kadar je bila mednarodna publikacija spremenjena s skupnimi spremembami, označenimi z (mod), se uporablja
ustrezni EN/HD.
Publikacija Leto Naslov EN/HD Leto
IEC 60079-17 - Eksplozivne atmosfere – 17. del: EN 60079-17 -
Pregledovanje in vzdrževanje
električnih inštalacij
IEC 60364 skupina Nizkonapetostne električne HD 60364 skupina
inštalacije
IEC 60364-4-41 2005 Nizkonapetostne električne HD 60364-4-41 2007
(mod) inštalacije – 4-41. del: Zaščitni
ukrepi – Zaščita pred električnim
udarom
- - + popravek julij 2017
IEC 60364-4-42 2010 Nizkonapetostne električne HD 60354-4-42 2011
(mod) inštalacije – 4-42. del: Zaščitni
ukrepi – Zaščita pred toplotnimi
učinki
+ A1 2014 + A1 2015
IEC 60364-4-44 2007 Električne inštalacije zgradb – HD 60364-4-442 2012
(mod) 4-44. del: Zaščitni ukrepi – Zaščita
pred napetostnimi in
elektromagnetnimi motnjami
+ A1 (mod) 2015 HD 60364-4-443 2016
IEC 60364-5-51 2005 Električne inštalacije zgradb – HD 60364-5-51 2009
(mod) 5-51. del: Izbira in namestitev
električne opreme – Splošna
pravila
- - + A11 2013
IEC 60364-5-52 2009 Nizkonapetostne električne HD 60364-5-52 2011
(mod) inštalacije – 5-52. del: Izbira in
namestitev električne opreme –
Inštalacijski sistemi

3

---------------------- Page: 7 ----------------------

SIST HD 60364-6 : 2016
IEC 60364-5-53 2001 Nizkonapetostne električne - -
inštalacije – 5-53. del: Izbira in
namestitev električne opreme –
Ločevanje, stikanje in krmiljenje
+ A1 (mod) 2002 HD 60364-5-534 2008
+ A2 (mod) 2015 HD 60364-5-534 2016
IEC 60364-5-54 - Nizkonapetostne električne HD 60364-5-54 -
inštalacije – 5-54. del: Izbira in
namestitev električne opreme –
Ozemljitve in zaščitni vodniki
IEC 61557-6 - Električna varnost v EN 61557-6 -
nizkonapetostnih razdelilnih
sistemih za izmenične napetosti
do 1 kV in enosmerne napetosti
do 1,5 kV – Oprema za
preskušanje, merjenje ali
nadzorovanje zaščitnih ukrepov –
6. del: Naprave na preostali
(residualni) tok v sistemih TT, NT
in IT
IEC 61557 skupina Električna varnost v IEC 61557 skupina
nizkonapetostnih razdelilnih
sistemih za izmenične napetosti
do 1 kV in enosmerne napetosti
do 1,5 kV – Oprema za
preskušanje, merjenje ali
nadzorovanje zaščitnih ukrepov



4

---------------------- Page: 8 ----------------------

SIST HD 60364-6 : 2016

VSEBINA Stran
Uvod . 2
Dodatek ZA (normativni): Normativna sklicevanja na mednarodne publikacije
z njihovimi ustreznimi evropskimi publikacijami . 3
Predgovor . 7
6.1 Področje uporabe . 9
6.2 Zveze s standardi . 9
6.3 Izrazi in definicije . 10
6.4 Prvo preverjanje . 10
6.4.1 Splošno . 10
6.4.2 Pregled . 11
6.4.3 Preskušanje . 12
6.4.4 Poročanje o prvem preverjanju . 17
6.5 Periodično preverjanje . 18
6.5.1 Splošno . 18
6.5.2 Pogostnost periodičnega preverjanja . 18
6.5.3 Poročanje o periodičnem preverjanju . 19
Dodatek A (informativni): Sklicevanje na mednarodne publikacije
z njihovimi ustreznimi evropskimi publikacijami . 20
Dodatek B (informativni): Metode za merjenje izolacijske upornosti/impedance tal in sten
proti zemlji ali proti zaščitnemu vodniku . 21
B.1 Splošno . 21
B.2 Preskusna metoda za merjenje impedance tal ali sten z izmenično napetostjo. 21
B.3 Preskusna elektroda 1 . 22
B.4 Preskusna elektroda 2 . 22
Dodatek C (informativni): Meritev upornosti ozemljila – metode C1, C2 in C3 . 24
C.1 Metoda C1 – meritev upornosti ozemljila z merilnikom ozemljitve . 24
C.2 Metoda C2 – meritev upornosti ozemljila z merilnikom impedance okvarne zanke . 25
C.3 Metoda C3 – meritev upornosti ozemljila s tokovnimi kleščami . 26
Dodatek D (informativni): Navodilo za uporabo pravil točke 6.4 Prvo preverjanje . 28
Dodatek E (informativni): Vzorci obrazca za poročanje . 31
Dodatek F (informativni): Vzorci obrazca za pregled električnih inštalacij . 38
F.1 Vzorec zapisa o zadevah, ki jih je treba pregledati pri prvem preverjanju električne inštalacije . 38
F.2 Vzorec zapisa o pregledu zadev, ki jih je treba pregledati pri že delujoči električni inštalaciji . 42
Dodatek G (informativni): Vzorec obrazca o podatkih o tokokrogu in rezultatih meritev . 47
Dodatek H (informativen) Seznam opomb, ki se nanašajo na določene države . 48
Literatura. 51

Slika B.1: Preskusna elektroda 1 . 22
Slika B.2: Preskusna elektroda 2 . 23
Slika C.1: Meritev upornosti ozemljila . 25
5

---------------------- Page: 9 ----------------------

SIST HD 60364-6 : 2016
Slika C.2: Meritev upornosti ozemljila z merilnikom impedance zemeljske okvarne zanke . 26
Slika C.3: Meritev upornosti ozemljila s tokovnimi kleščami . 27

Preglednica 6.1: Najmanjše vrednosti izolacijske upornosti . 13
Preglednica A.1: Specifična upornost bakrenega ožičenja R pri 30 ºC v odvisnosti od nazivnega
prereza S za grobi izračun upornosti vodnika . 20
Preglednica E.1: Poročilo o preverjanju električne inštalacije (nove ali starejše inštalacije) . 31
Preglednica E.2: Poročilo o stanju električne inštalacije (obstoječe) . 34
Preglednica G.1: Vzorec obrazca o podatkih o tokokrogu in rezultatih meritev . 47



6

---------------------- Page: 10 ----------------------

SIST HD 60364-6 : 2016

MEDNARODNA ELEKTROTEHNIŠKA KOMISIJA


NIZKONAPETOSTNE ELEKTRIČNE INŠTALACIJE –
6. del: Preverjanje

Predgovor

1. Mednarodna elektrotehniška komisija (IEC) je svetovna organizacija za standardizacijo, ki združuje vse nacionalne
elektrotehnične komiteje (nacionalni komiteji IEC). Cilj IEC je pospeševati mednarodno sodelovanje v vseh vprašanjih
standardizacije s področja elektrotehnike in elektronike. V ta namen poleg drugih aktivnosti izdaja mednarodne standarde,
tehnične specifikacije, tehnična poročila, javno dostopne specifikacije (PAS) in vodila (v nadaljevanju: publikacije IEC). Za
njihovo pripravo so odgovorni tehnični odbori; vsak nacionalni komite IEC, ki ga zanima obravnavana tema, lahko sodeluje
v tem pripravljalnem delu. Prav tako lahko v pripravi sodelujejo mednarodne organizacije ter vladne in nevladne ustanove,
ki so povezane z IEC. IEC deluje v tesni povezavi z mednarodno organizacijo za standardizacijo ISO skladno s pogoji,
določenimi v soglasju med obema organizacijama.
2. Uradne odločitve ali sporazumi IEC o tehničnih vprašanjih, pripravljeni v tehničnih odborih, kjer so prisotni vsi nacionalni
komiteji, ki jih tema zanima, izražajo, kolikor je mogoče, mednarodno soglasje o obravnavani temi.
3. Publikacije IEC imajo obliko priporočil za mednarodno uporabo ter jih kot takšne sprejmejo nacionalni komiteji IEC. Čeprav
IEC skuša zagotavljati natančnost tehničnih vsebin v publikacijah IEC. IEC ni odgovoren za način uporabe ali za možne
napačne interpretacije končnih uporabnikov.
4. Da bi se pospeševalo mednarodno poenotenje, so nacionalni komiteji IEC v svojih nacionalnih in regionalnih standardih
dolžni čim pregledneje uporabljati mednarodne standarde. Vsako odstopanje med standardom IEC in ustreznim nacionalnim
ali regionalnim standardom je treba v slednjem jasno označiti.
5. IEC sam ne izvaja potrjevanja skladnosti. Storitve ugotavljanja skladnosti in na nekaterih območjih tudi dostop do znakov
skladnosti IEC izvajajo neodvisni certifikacijski organi. IEC ni določil nobenega postopka v zvezi z označevanjem kot znakom
strinjanja in ne prevzema nikakršne odgovornosti za storitve, ki jih izvajajo neodvisni certifikacijski organi. opremo, ki je
deklarirana, da ustreza kateremu od publikacij IEC.
6. Vsi uporabniki naj bi si zagotovili zadnjo izdajo teh publikacij.
7. IEC ali njegovi direktorji, zaposleni, uslužbenci ali agenti, vključno s samostojnimi strokovnjaki ter člani tehničnih odborov in
nacionalnih komitejev IEC, ne prevzemajo nobene odgovornosti za kakršnokoli osebno poškodbo, škodo na premoženju ali
katerokoli drugo škodo kakršnekoli vrste, bodisi posredne ali neposredne, ali za stroške (vključno z zakonitim lastništvom) in
izdatke, povezane s publikacijo, njeno uporabo ali zanašanjem na to publikacijo IEC ali katerokoli drugo publikacijo IEC.
8. Posebno pozornost je treba posvetiti normativnim virom, na katere se sklicuje ta publikacija. Uporaba navedenih publikacij
je nujna za pravilno uporabo te publikacije.
9. Opozoriti je treba na možnost, da bi lahko bil kateri od elementov tega mednarodnega standarda predmet patentnih pravic.
IEC ne odgovarja za identifikacijo nobene od teh patentnih pravic.

Mednarodni standard IEC 60364-6 je pripravil tehnični odbor IEC/TC 64 Električne inštalacije in zaščita
pred električnim udarom.

Ta druga izdaja razveljavlja in nadomešča prvo izdajo iz leta 2006 ter je tehnično revidirana.

Ta izdaja vsebuje naslednje pomembne tehnične spremembe glede na zadnjo izdajo:

a) zveze s standardi so posodobljene na to izdajo;

b) oštevilčenje je prilagojeno sedanjemu oštevilčenju IEC;

c) zahtevam za prvi pregled so dodane tri točke;

d) spremenjeno je zaporedje preskušanja;

e) splošnim zahtevam za periodično poročanje je dodanih več podrobnosti;

f) v dodatku A je nova preglednica A.1: Vrednosti specifične upornosti bakrenih vodnikov;

g) brisana je vsebina dodatka D: Primer diagrama, ki je primeren za ocenitev padca napetosti;
7

---------------------- Page: 11 ----------------------

SIST HD 60364-6 : 2016
h) brisana je vsebina dodatka E: Priporočila za uporabo rabljene električne opreme električnih
inštalacij;

i) vsebina dodatka F je nadomeščena z novim dodatkom E: Vzorci obrazca za poročanje;

j) dodatek G je spremenjen v dodatek F: Vzorci obrazca za pregled električnih inštalacij;

k) dodatek H je spremenjen v dodatek G: Vzorec obrazca o podatkih o tokokrogu in rezultatih meritev;

l) v dodatku H so navedene opombe, ki se nanašajo na nekatere države;

m) literatura je posodobljena.

Besedilo tega standarda temelji na naslednjih dokumentih:

FDIS Poročilo o glasovanju
64/2107/FDIS 64/2114/RVD

Celotna informacija o glasovanju za sprejetje tega standarda je na voljo v poročilu o glasovanju,
navedenem v gornji preglednici.
Ta dokument je bil pripravljen v skladu z Direktivami ISO/IEC, 2. del.

Seznam vseh delov skupine standardov IEC 60364 pod splošnim naslovom Nizkonapetostne električne
inštalacije je na voljo na spletni strani IEC.

Bralec mora biti pozoren na dejstvo, da je v dodatku H seznam vseh točk "v nekaterih državah" o razlikah
v praksah, ki so po naravi manj trajne glede na vsebino tega standarda.

Tehnični odbor je sklenil, da bo vsebina tega standarda ostala nespremenjena do datuma, določenega
za zaključek periodičnega pregleda, ki je določen na spletni strani IEC "http://webstore.iec.ch" pri
podatkih za to publikacijo. Po tem datumu bo publikacija:
– ponovno potrjena,
– razveljavljena,
– zamenjana z novo izdajo ali
– dopolnjena.

POMEMBNO: Logotip "v barvah" na platnicah te publikacije opozarja, da vsebuje barve, ki so
potrebne za pravilno razumevanje njene vsebine. Uporabniki naj zato tiskajo ta dokument z
barvnim tiskalnikom.


8

---------------------- Page: 12 ----------------------

SIST HD 60364-6 : 2016

Nizkonapetostne električne inštalacije – 6. del: Preverjanje

6.1 Področje uporabe

Ta del IEC 60364 obravnava zahteve za prvo preverjanje in periodična preverjanja električne inštalacije.

Točka 6.4 obravnava zahteve za prvo preverjanje s pregledom in preskušanjem električne inštalacije,
da se na najustreznejši način ugotovi, ali so izpolnjene zahteve drugih delov IEC 60364 in zahteve za
poročanje o rezultatih prvega preverjanja. Prvo preverjanje se izvede po dokončanju nove inštalacije ali
po dodelavi oziroma spremembi obstoječe.

Točka 6.5 obravnava zahteve za periodično preverjanje električne inštalacije, da se na najustreznejši
način ugotovi, ali so inštalacija in vsi njeni sestavni deli opreme v zadovoljivem stanju za uporabo in ali
so izpolnjene zahteve za poročanje o rezultatih periodičnega preverjanja.

6.2 Zveze s standardi

Za uporabo tega dokumenta so, v celoti ali delno, nujno potrebni spodaj navedeni dokumenti. Pri
datiranih dokumentih velja samo navedena izdaja. Pri nedatiranih dokumentih velja najnovejša izdaja
dokumenta (vključno z morebitnimi spremembami).
IEC 60079-17 Eksplozivne atmosfere – 17. del: Pregledovanje in vzdrževanje
električnih inštalacij

IEC 60364 (vsi deli) Nizkonapetostne električne inštalacije

IEC 60364-4-41:2005 Nizkonapetostne električne inštalacije – 4-41. del: Zaščitni ukrepi –
Zaščita pred električnim udarom

IEC 60364-4-42:2010 Nizkonapetostne električne inštalacije – 4-42. del: Zaščitni ukrepi –
Zaščita pred toplotnimi učinki
IEC 60364-4-42:2010/AMD1:2014

IEC 60364-4-44:2007 Električne inštalacije zgradb – 4-44. del: Zaščitni ukrepi – Zaščita pred
napetostnimi in elektromagnetnimi motnjami
IEC 60364-4-44:2007/AMD1:2015

IEC 60364-5-51:2005 Električne inštalacije zgradb – 5-51. del: Izbira in namestitev električne
opreme – Splošna pravila

IEC 60364-5-52:2009 Nizkonapetostne električne inštalacije – 5-52. del: Izbira in namestitev
električne opreme – Inštalacijski sistemi

IEC 60364-5-53:2001 Nizkonapetostne električne inštalacije – 5-53. del: Izbira in namestitev
električne opreme – Ločevanje, stikanje in krmiljenje
IEC 60364-5-53:2001/AMD1:2002
IEC 60364-5-53:2001/AMD2:2015

IEC 60364-5-54 Nizkonapetostne električne inštalacije – 5-54. del: Izbira in namestitev
električne opreme – Ozemljitve in zaščitni vodniki

IEC 61557 (vsi deli) Električna varnost v nizkonapetostnih razdelilnih sistemih za izmenične
napetosti do 1 kV in enosmerne napetosti do 1,5 kV – Oprema za
preskušanje, merjenje ali nadzorovanje zaščitnih ukrepov

IEC 61557-6 Električna varnost v nizkonapetostnih razdelilnih sistemih za izmenične
napetosti do 1 kV in enosmerne napetosti do 1,5 kV – Oprema za
preskušanje, merjenje ali nadzorovanje zaščitnih ukrepov – 6. del:
Naprave na preostali (residualni) tok v sistemih TT, NT in IT


9

---------------------- Page: 13 ----------------------

SIST HD 60364-6 : 2016
6.3 Izrazi in definicije

V tem dokumentu se uporabljajo naslednji izrazi in definicije.

6.3.1
preverjanje
vsi ukrepi, ki se uporabljajo za preverjanje skladnosti električne inštalacije z ustreznimi zahtevami IEC
60364

OPOMBA 1: Preverjanje obsega pregled, preskušanje in poročanje.

6.3.2
pregled
preiskovanje električne inštalacije na vse primerne načine, da se zagotovita pravilna izbira in prava
namestitev električne opreme

6.3.3
preskušanje
izvajanje ukrepov za ocenjevanje električne inštalacije s sredstvi, s katerimi se dokaže njena
učinkovitost

OPOMBA 1: Preskušanje vključuje potrjevanje vrednosti z uporabo ustreznih merilnih instrumentov, kadar teh vrednosti ni bilo
mogoče zaznati s pregledom.

6.3.4
poročanje
zapis rezultatov pregleda in preskušanja

6.3.5
vzdrževanje
kombinacija vseh tehničnih in administrativnih postopkov, vključno z nadzorom, namenjena temu, da
inštalacija ostane v stanju, v katerem je sposobna opravljati zahtevano funkcijo, ali da se povrne vanj

6.4 Prvo preverjanje

6.4.1 Splošno

6.4.1.1 Vsako inštalacijo je treba preverjati med namestitvijo, kolikor je to ustrezno, in ko je dokončana,
preden je predana v uporabo uporabniku.

6.4.1.2 Osebi, ki izvaja prvo preverjanje, morajo biti dostopne informacije, zahtevane v točki 514.5
standarda IEC 60364-5-51, in druge informacije, potrebne za prvo preverjanje.

6.4.1.3 Prvo preverjanje mora vsebovati primerjavo rezultatov z ustreznimi kriteriji, ki potrjujejo, da so
bile izpolnjene zahteve skupine standardov IEC 60364.

6.4.1.4 Sprejeti je treba ukrepe, s katerimi se zagotovi, da preverjanje ne povzroči nobene nevarnosti
za ljudi ali živali in nobene škode na premoženju ali opremi, tudi če je tokokrog v okvari.

6.4.1.5 Preveriti je treba, da je razširitev, dodatek ali sprememba obstoječe inštalacije skladna s skupino
standardov IEC 60364 in da ne vpliva na varnost obstoječe inštalacije ter da obstoječa inštalacija ne
vpliva na varnost nove inštalacije.

6.4.1.6 Preverjanje sme izvajati le strokovna oseba, kompetentna za preverjanje.

OPOMBA: Zahteve za kvalifikacijo so predmet nacionalne obravnave.


10

---------------------- Page: 14 ----------------------

SIST HD 60364-6 : 2016

6.4.2 Pregled

6.4.2.1 Pregled mora biti izveden pred preskušanjem in po navadi ga je treba izvesti, preden se
inštalacija priključi na napetost

6.4.2.2 Pregled mora potrditi, da je električna oprema kot del pritrjene inštalacije:

‒ skladna z varnostnimi zahtevami ustreznih standardov za opremo;

OPOMBA:  To je mogoče ugotoviti s preiskavo proizvajalčeve dokumentacije, oznak ali certifikatov.

‒ pravilno izbrana in nameščena skladno s skupino standardov IEC 60364 ob upoštevanju navodil
proizvajalca;

‒ brez vidnih poškodb ali okvar
...

Questions, Comments and Discussion